Our Projects Portfolio
| No | Project | Client | Completion | ||||||
|---|---|---|---|---|---|---|---|---|---|
| 11 | SKPP & SKPI - SPBG ECOSTATION TAHAP I For PT. PERTAMINA (Persero) | PT. Binarasano Engineering | 2016 | ||||||
| 12 | SKPP&SKPI Migas Certification-Benoa Floating Regasification Unit (FRU) For PT Pelindo Energi Logistik (PEL). | PT. PJ Tek Mandiri | 2016 | ||||||
| 13 | SKPP 3.100 meter Pipeline Tarakan, PLN Tarakan Project. | PT. Binarasano Engineering | 2016 | ||||||
| 14 | SKPP&SKPI Migas Certification-Benoa Floating Regasification Unit (FRU) For PT Pelindo Energi Logistik (PEL): Rotating equipment, Pressure Vessel, Pipeline, Pressure Safety Valve, Electrical Equipment. | PT. PJ Tek Mandiri | 2016 | ||||||
| 15 | Jasa Sertifikasi MIGAS, South Sembakung Gas Plant. | JOB Pertamina-Medco E&P Simenggaris | 2016 | ||||||
| 16 | SKPP of Flowline, re-certification for Flowline. | PT. Ravindo Putra Mandri | 2016 | ||||||
| 17 | SKPI Plant | PT. Ravindo Putra Mandri | 2015 | ||||||
| 18 | Inspection Technical Drawing. | Total E & P Indonesie | 2015 | ||||||
| 19 | Inspection or Expediting Service | PT Tripatra Engineering & Constructors | 2014 | ||||||
| 20 | Inspection Technical Drawing | Total E & P Indonesie | 2014 | ||||||







