11 Structural design review and independent analysis of XA Bridge Support, XA Flare, XA Process, XA Service, XA Well, XB Flare, XB Process, XD Well and XMA Well platforms for Re-Qualification for life extension. (Done by Milka Indrawati). PERTAMINA PHE ONWJ 2009
12 Structural design review for Adjacent Wellhead Platform Bx, Fx and Nx for MIGAS SKKP Design verification for Certification. Tunu Field Development Project Phase 12 (Done by Milka Indrawati). TOTAL E&P Indonesie 2008
13 Pipeline Stress analysis of Darajat Geothermal Unit II & III (various size of Pipeline at steam & condensate line) for MBP SKPP Re-certification. ChevronTexaco Energy Indonesia 2008
14 Piping Stress analysis, Pipe Support calculation, Review Pipeline of Oil Tank Terminal Project for MIGAS SKPP Design verification for Certification. PT. Shell Indonesia Gresik - East Java 2008
15 Structural design review of WHP-A Modification Ujung Pangkah Offshore Phase II Project (Done by Yeti R). HESS (Indonesia-Pangkah) Limited 2007
16 Platform Inspector for annual inspection NMP2 Platform, FKP Platform, Tunu North (Done by Andiawan H). Total E&P Indonesie 2006
17 Platform Inspector of Zelda F Platform for piling installation and Hook up jacket, Caisson, Cellar deck, Sub Cellar deck, Mezzanine deck, Topside deck (Done by Andiawan H). CNOOC SES LTD 2005 - 2006
18 As built verification and drawing development of Unit CDU, NHDT and HVU for Risk Based Inspection study Pertamina UP-V Balikpapan 2005
19 Platform Inspector for annual inspection Manifold Wellhead Platform C (MWP-C), Peciko Field (Done by Andiawan H). Total E&P Indonesie 2005
20 As built verification and drawing development of Hydrogen Plant for Risk Based Inspection study. Pertamina UP-II Dumai - Sumatera - Indonesia 2002