Our Projects Portfolio
| No | Project | Client | Completion | ||||||
|---|---|---|---|---|---|---|---|---|---|
| 91 | Structural design review for Adjacent Wellhead Platform Bx, Fx and Nx for MIGAS SKKP Design verification for Certification. Tunu Field Development Project Phase 12 (Done by Milka Indrawati). | TOTAL E&P Indonesie | 2008 | ||||||
| 92 | Pipeline Stress analysis of Darajat Geothermal Unit II & III (various size of Pipeline at steam & condensate line) for MBP SKPP Re-certification. | ChevronTexaco Energy Indonesia | 2008 | ||||||
| 93 | Piping Stress analysis, Pipe Support calculation, Review Pipeline of Oil Tank Terminal Project for MIGAS SKPP Design verification for Certification. | PT. Shell Indonesia | 2008 | ||||||
| 94 | Tugubarat - Mini LPG Plant | PT Sumber Daya Kelola – BEXI | 2008 | ||||||
| 95 | MIGAS SKPP Inspection for Certification & Re-certification of: Pressure Vessel, Rotating Equipments, Pressure Safety Valve, Electrical Equipments, Metering System Tugu Barat Mini Plant Expansion. | PT. Sumber Daya Kelola | 2008 | ||||||
| 96 | MIGAS SKPP Inspection for Certification of Pumps | PT. Redeco | 2008 | ||||||
| 97 | Structural design review of WHP-A Modification Ujung Pangkah Offshore Phase II Project (Done by Yeti R). | HESS (Indonesia-Pangkah) Limited | 2007 | ||||||
| 98 | Platform Inspector for annual inspection NMP2 Platform, FKP Platform, Tunu North (Done by Andiawan H). | Total E&P Indonesie | 2006 | ||||||
| 99 | Platform Inspector of Zelda F Platform for piling installation and Hook up jacket, Caisson, Cellar deck, Sub Cellar deck, Mezzanine deck, Topside deck (Done by Andiawan H). | CNOOC SES LTD | 2005 - 2006 | ||||||
| 100 | As built verification and drawing development of Unit CDU, NHDT and HVU for Risk Based Inspection study | Pertamina UP-V | 2005 | ||||||







