Our Projects Portfolio
No Project Client Completion
121 RBI support data development for: Unit Catalytic Reforming Unit (CRU), Unit Naphtha Hydrotreating Unit (NHTU), Unit Crude Distillation Unit (CDU), Tank farm and Offsite of Pertamina RU-VII Sorong to PT WIDE & PIN RBI team. Pertamina RU-VII Sorong 2002
122 Reliability Centred Maintenance support data development for: Unit Platformer Unit 84 Paraxylene of Pertamina RU-IV, Cilacap to PT WIDE & PIN RCM Team Pertamina RU-IV Cilacap 2002
123 Platform Inspector for North Manifold Platform 2 (NMP 2), Flare KO Drum Platform (FKP), Drain Platform (DP) Tunu Field Development Project Phase 8 EPSC 2 (Done by Andiawan H). Total E&P Indonesie 2001 - 2002
124 Piping Stress analysis, Pipe Support calculation, Review Pipeline calculation of Nilam Satellite #5 to #6 (2 lines) for MIGAS SKPP Design verification for Certification. Virginia Oil Company of Indonesia 2001
125 Piping Stress analysis, Cross country Pipeline route analysis of PL – 403 & 404 for MIGAS SKPP Design verification for Certification. Pertamina Area Geothermal Kamojang 2001
126 Platform Inspector for Manifold Wellhead Platform B (MWP B) Modification, Peciko Field Development Project Phase 2 (Done by Andiawan H). Total E&P Indonesie 2001
127 As built verification and drawing development of High Vacuum Unit 110, Dumai for Risk Based Inspection study. Pertamina UP-II - Dumai 2001
128 As built verification and drawing development of Sulfolane Unit (Unit 85), Paraxylene Unit (Unit 84), and Platformer FOC2 Unit (Unit 014) Cilacap for Risk Based Inspection study. Pertamina UP-IV - Cilacap 2001
129 As built verification and drawing development of LPG Plant, Pangkalan Brandan for Risk Based Inspection study. Pertamina UP-I, Pangkalan Brandan 2001
130 Pressure Vessel - MIGAS Certification (Expro V) Expro Indonesia 2001

<<  < 8 9 10 11 12 13 14 15 16 17 18 > 

Our Valuable Clients