Our Projects Portfolio
No Project Client Completion
111 SAP data development input for Pertamina RU-VI, Balongan all plant units (except Unit 15 & 16) to PT WIDE & PIN Software Team Pertamina RU-VI Balongan 2003
112 As built verification and drawing development of Hydrogen Plant for Risk Based Inspection study. Pertamina UP-II 2002
113 Piping Stress analysis, Cross country Pipeline route analysis of PL – 401 & 402 for MIGAS SKPP Design verification for Certification. Pertamina Area Geothermal Kamojang 2002
114 As built verification and drawing revised of Crude Distillation Unit (CDU), Naphtha Hydrotreating Unit (NHTU) and Catalytic Reforming Unit (CRU) for Risk Based Inspection study. Pertamina UP-VII 2002
115 Platform Inspector for Tunu Oily Water Treatment (TN-OWT) Fabrication, Tunu Field Development Project Phase 8 (Done by Andiawan H). Total E&P Indonesie 2002
116 LES, EA, EB, ED, EJ, E-COMP, KLB PLATFORM JAVA SEA BP/ARCO through EPC PT Merlasakti Abadi 2002
117 Rotating Equipment – MIGAS Certification PT. Hanover Indonesia for Pertamina Bunyu 2002
118 Compressor Package - MIGAS Certification UNOCAL East Kalimantan 2002
119 Pump - MIGAS Certification CNOOC South Sumatra 2002
120 RBI support data development for: Unit Hydrocracker, Unit Hydrogen Plant, Unit Amine & LPG Recovery of Pertamina RU-II Dumai to PT WIDE & PIN RBI team. Pertamina RU-II Dumai 2002

<<  < 7 8 9 10 11 12 13 14 15 16 17 >  >>

Our Valuable Clients